tariq chaudhary

Bio

Currently as Associate and Senior Structural Engineer with Desai/Nasr Consulting Engineers, Inc. (December 2001 through present). Formerly as Design Engineer with Obayashi Corporation, Tokyo, Japan (October 1999 - Nov. 2001) and as Senior Engineer with National Engineering Services Pakistan, Lahore, Pakistan (April 1993 - August 1996).

Work experience includes computer modeling, finite element analysis, structural analysis and design of steel/concrete buildings, highway bridges underground reservoirs and towers; seismic analysis and design of structures; rehabilitation of existing buildings; vibration-based structural identification; alignment of bridges, preparation of bid documents.

EDUCATION

  • Ph.D. Structural Engineering, 1999
    University of Tokyo
    Tokyo, Japan
  • M.S. Structural Engineering, 1992
    State University of New York at Buffalo
    Buffalo, New York
  • Bachelor of Science in Engineering with Honors, 1990
    University of Engineering and Technology
    Lahore, Pakistan.


MAJOR PROJECTS INCLUDE

  • Greektown Casino Hotel, Detroit: 30 story reinforced concrete structure with conventionally reinforced and post-tensioned slabs, beams and transfer girders. Lateral system consisted of shear walls.
  • Greektown Casino -2000 Cars/2 Below Grade Level Parking Structure, Detroit, Michigan
  • Boulevard shops, Rochester Hills, MI: 2 story, 39,000 ft2 foot-print, steel frame retail and office building.
  • ZF Tech Addition (78,000 ft2 manufacturing area & 90,000 ft2 office space), Northville, Michigan
  • ZF Tech Addition - Newton, South Carolina
  • Southpoint Community Christian Church - Trenton, Michigan
  • St. Peters Church, Macomb, Michigan.
  • Victor Park Plaza, N&J Building, Livonia, Michigan
  • Eaton Academy extension, Birmingham. Michigan
  • Michigan State University - Food Science Building, East Lansing Michigan
  • St. Joseph Mercy Macomb - 4-Story Patient Tower - Clinton Twp., Michigan
  • Torrey Road Bridge - Fenton, Michigan
  • Newburgh Road Bridge - Wayne, Michigan
  • Brommen Medical Center - Pedestrian tunnel - Norman, Illinois
  • 52 million gallon capacity underground LNG storage tanks, Incheon, South Korea.
  • Pre-stressed concrete Highway bridges on Motorway M3 & N70 National Highway (max. span 150 ft, max. length 3000 ft), Pakistan.


LICENSES EARNED

  • Registered Professional Engineer - Michigan, Oregon, Province of Alberta, Pakistan
  • Structural Engineer - in- Training - United Kingdom


PROFESSIONAL AFFILIATIONS

  • Member - American Society of Civil Engineers
  • Member - Structural Engineers Association of Michigan


PUBLICATIONS

  • Structural Analysis Of Multi-Story Frames Through Neural Network
  • An Expert System for Repair of Concrete Structures
  • "FEM" Modeling of a large Pile Group for Settlement Control in Weak Rock